Finished Projects
Our suite of integrated services ensures the highest degree of quality, safety, efficiency and innovation on your projects.
Project
Company
End-User
Period
Type of service
AL Ameen and AL Rasheed
400Kv Substations
ALOSTOM
GEEP
2004 – 2005
Installation and commissioning of RTU & PAPX/PLC and Fire Alarm System.
Central Child
Hospital
Atlas
MoE
2006
Supply and Installation of Fire Alarm System.
Distribution
Substation 33KV
BTC
MoE
2007 – 2008
Supply and Installation of Fire Alarm Systems, for 115 Sites.
ETP, Salah Alden, Samarra
Diesel Power Station, Iraq
Siemens
MoE
2008 – 2011
Installation and commissioning of RTU & PAPX/PLC, Public Address, Central Clock and Fire Alarm System.
Mulla Abdulla 132kv
power plant
Dong Fu
GEEP
2009
Installation and commissioning of RTU & PAPX/PLC and Fire Alarm System.
Samarra North Sub
Station 132Kv
Siemens
ETP
2010
Installation and commissioning of RTU & PAPX/PLC and Fire Alarm System.
Accommodation
Employs
Baghdad Towers
British Embassy
2012
Installation, commissioning and training for Fire Alarm System.
Ministry of
Justice
BTC
Ministry of Justice
2012
Supply and Installation Fire Alarm System, 3000 points.
Haditha 132Kv
Substation
Siemens
GEEP
2013
Installation and commissioning of RTU & PAPX/PLC and Fire Alarm System.
Haditha Diesel
Power Plant
ALOSTOM
GEEP
2013
Installation and commissioning of RTU & PAPX/PLC, Public Address, Central Clock and Fire Alarm System.
Communications Optical System Baghdad Airport
Selex ES
Baghdad Airport
2015
Supply and implement a communications optical system in The Baghdad International Airport to connect the Instrument. Landing system (ILS) with control towers at the airport.
Communications Optical System Baghdad Airport
Selex ES
Baghdad Airport
2015
Works of caravans (Shelter Cabine) according to the required specifications.
Communications optical system Basra Airport
Selex ES
Basra Airport
2015
Supply and implement a communications optical system in The Basra International Airport to connect the Instrument. Landing system (ILS) with control towers at the airport.
Accommodation
Employs
My-Tec
Australian Embassy
2016
Installation and commissioning of Fire Alarm System and Evacuation System.
Accommodation
Employs
My-Tec
Australian Embassy
2018
Supplying, installation and commissioning of Fire Alarm System and Evacuation System.
Basmaya Gas
Power Plan
BTC
MASS Group Holding
2018 – 2020
Installation, Testing and Commissioning Fire Alarm System for the Basmaya Gas Power Plan (Stage 1 & 2)
Al-Nakheel Mall
Al-Anbar City
IMDES
Al-Nakheel Mall
2018 – 2020
Supplying and Installation of central and sub-sound systems for the mall, restaurants, cafes, fire alarm, IPTV, and a surveillance system.
Electrical works for high
and low voltage
IMDES
Al-Baz Hospital
2018 – 2020
Electrical works for high and low voltage, with specialized hospital systems.
Basmaya Husieniya
Basmaya
Jamila
PLC & Teleprotection
IMDES
MOE
2022
Installation, commissioning and testing teleprotection signal.
Alarm and firefighting
systems
IMDES
Switch Company Building
2023
Supplying, installation and commissioning of fire alarm and firefighting systems with water tanks 30 M3 / FM200 System.
Accommodation
Employs
IMDES
Australian Embassy
2023
Supplying, installing and testing water tank for firefighting system.
Basmaya Dowra
Power plan
IMDES
MOE
2023
Installation, commissioning and testing teleprotection signal.